The return on an automation investment does not come from a single formula; it depends on a few figures specific to your line. The tool below runs on your own figures and prints the operation it performed underneath every result.

CALCULATOR

Run the numbers with your own figures

Every field is filled in by you. The tool only does arithmetic and shows the formulas it uses on screen.

The figures you type never leave your browser: the calculation runs on this page and no data is sent to a server.

The tool contains no Cortiva assumptions. There is no saving rate, no headcount reduction factor, no machine price and no industry average; every figure is yours and the tool only does arithmetic.

Enter every amount in the same currency; the tool does not convert rates.

Use a point for decimals.

End of line labour

This figure is your own estimate; the tool suggests no reduction rate.

Stretch film consumption

Investment and payback

Take it from the proposal you hold.

Result

Annual labour cost today
Annual labour cost after automation
Annual labour difference
Pallets per year
Annual film consumption, today (kilograms)
Annual film consumption, after automation (kilograms)
Annual film difference
Total annual difference
Simple payback period

The result is indicative; final figures are given in the engineering proposal.

Formulas used

The tool performs only the operations below. Under each result the same formula appears again, written with your own figures.

  • Annual labour cost = shifts per day × headcount per shift × annual cost per person
  • Annual labour difference = cost today - cost after automation
  • Pallets per year = pallets per day × working days per year
  • Annual film consumption = pallets per year × film per pallet ÷ 1000
  • Annual film difference = (consumption today - consumption after) × film unit price
  • Total annual difference = annual labour difference + annual film difference
  • Simple payback period = investment amount ÷ total annual difference × 12

Data needed for the calculation

The tool above runs on four headings. Gather the list below and send it to us, and we can build a far more realistic picture for your line.

These items are asked of you

Production
  • Shift count and annual working days
  • Headcount at the end of the line (palletizing and casing stations)
  • Pallets / cases per day (average and peak figures separately)
Product and pallet
  • Case dimensions and filled product weight
  • Pallet type and loaded pallet height
  • Current stretch film consumption (film weight per pallet)
Site
  • Existing layout drawing (AutoCAD or a scaled sketch)
  • Space constraints, ceiling height and conveyor level

The result is indicative; final figures are given in the engineering proposal.

Share the data and we will run the numbers together.

We come back with an indicative assessment; final figures are given in the engineering proposal.